Velo3D Unveils Forge 1: A 289,000-Sq-Ft Metal Additive Manufacturing Hub

  • Velo3D opened its Livermore Production Campus, Forge 1, a 289,000-square-foot metal additive manufacturing facility on July 15, 2026.
  • The campus includes approximately 270,000 square feet of production space designed to support over 40 large-format metal additive manufacturing systems, with capacity to expand beyond 100 systems.
  • Forge 1 complements Velo3D's Fremont headquarters, creating an integrated ecosystem that accelerates the path from concept to production.
  • The facility supports machine assembly, production-scale printing, post-processing, inspection, quality assurance, and customer acceptance under one roof.

Velo3D's Forge 1 opening underscores the strategic importance of strengthening America's industrial base and resilient supply chains. As governments and industries prioritize trusted domestic manufacturing, Velo3D positions itself as a key player in accelerating the adoption of additive manufacturing for mission-critical components. The facility's vertically integrated approach reduces time to production and increases manufacturing flexibility, addressing critical needs in aerospace, defense, energy, and other strategic sectors.

Production Scaling
How Velo3D will ramp up production operations at Forge 1 and achieve its anticipated capacity of over 40 large-format metal additive manufacturing systems.
Customer Demand
Whether the growing demand across aerospace, defense, energy, and other strategic industries will sustain Velo3D's expansion plans.
Supply Chain Resilience
The pace at which Velo3D can strengthen domestic production capabilities and support allied manufacturing through its integrated ecosystem.