MAX Power Expands Saskatchewan Land Position by 50% with Aurora Project Permits

  • MAX Power Mining Corp. acquired permits for the Aurora Project, adding 660,263 acres to its Saskatchewan landholdings, increasing total permitted land to ~2 million acres.
  • The Aurora Project adjoins the Lawson Discovery and is interpreted to have similar high-impact potential for Natural Hydrogen systems.
  • Lawson-Aurora combination covers a contiguous 90-km-long area along major highway, rail, and industrial infrastructure near Moose Jaw.
  • Additional permits added include Ogema (100,530 acres), Kyle (24,812 acres), and Fox Valley (44,798 acres).
  • Commercial validation drilling continues at Lawson Complex #1, Canada’s first confirmed Natural Hydrogen subsurface system.

MAX Power’s expansion of its permitted land position by over 50% positions the company as a key player in the emerging Natural Hydrogen sector. The strategic acquisition of the Aurora Project, adjacent to the Lawson Discovery, enhances MAX Power’s optionality and potential for district-scale development along Saskatchewan’s Genesis Trend. This move aligns with broader industry trends toward decarbonization and the commercialization of new primary energy sources.

Commercial Validation
The pace at which commercial validation drilling at Lawson Complex #1 confirms the scalability of Natural Hydrogen systems will determine MAX Power’s near-term monetization pathways.
Geological Potential
Whether the Aurora Project can replicate or exceed the geological success of the Lawson Discovery, given its similar structural and geological characteristics.
Industrial Synergies
How MAX Power leverages its proximity to Moose Jaw’s industrial corridor and emerging AI data center development to secure strategic partnerships and demand for Natural Hydrogen.