NevGold Expands Oxide Gold and Antimony Mineralization at Nevada's Limousine Butte

  • NevGold reported oxide gold mineralization expansion both inside and outside the 2026 pit-shell at its Limousine Butte Project in Nevada.
  • Drill hole LB26-007 Lower intercepted 1.06 g/t oxide gold over 42.7 meters outside the pit-shell, while LB26-004 returned 5.00 g/t oxide gold over 3.0 meters inside the pit-shell.
  • Antimony was also detected in the system, with LB26-007 Upper returning 0.20% antimony over 16.8 meters.
  • The company has completed 40 holes with 33 assays still pending and is fully funded for the next 12 to 18 months with over $45 million in treasury.

NevGold's findings are part of a broader trend in Nevada's oxide gold districts, where companies are re-examining historical data for critical minerals like antimony. The strategic shift is driven by antimony's designation as a critical mineral in the U.S. and tightening Chinese export controls. The company's ability to expand both oxide gold and antimony mineralization positions it favorably in a market increasingly focused on dual-revenue streams from established mining districts.

Resource Expansion
Whether the pending assays from the remaining 33 holes will confirm or contradict the current positive results.
Economic Viability
The pace at which NevGold can advance its Preliminary Economic Assessment and engineering studies to demonstrate the economic viability of the project.
Market Dynamics
How the company will leverage the spatially distinct gold-rich and antimony-rich domains to optimize production based on market conditions.