Horizon Petroleum Advances Poland Well Workover with Integrity Confirmation
Event summary
- Horizon Petroleum's Polish subsidiary EKZ has completed rig mobilization and begun re-entry operations at the Lachowice 7 well.
- Two casing pressure tests confirmed the physical integrity of the wellbore, allowing the workover program to proceed.
- The next steps include removing existing downhole equipment, re-perforating the reservoir, and conducting acid stimulation.
- Stimulation and production testing are expected to commence by late August 2026 and continue into early September 2026.
The big picture
Horizon Petroleum's progress at the Lachowice 7 well is a critical step in developing Poland's domestic natural gas reserves, aligning with broader European efforts to enhance energy security amid geopolitical uncertainties. The confirmation of wellbore integrity mitigates key risks and sets the stage for potential long-term production capabilities. Success here could position Horizon as a significant player in Poland's energy sector.
What we're watching
- Production Potential
- Whether the Lachowice gas accumulation can be confirmed as a significant new domestic source of natural gas for Poland.
- Execution Risk
- The pace at which Horizon Petroleum can complete the workover and production testing without operational delays.
- Market Impact
- How successful production from this well could influence Poland's energy independence and security.
