Atico Mining Reports Mixed Q2 2026 Results: Copper Up, Gold Down

  • Atico Mining produced 2.08 million pounds of copper and 1,465 ounces of gold in Q2 2026.
  • Copper production decreased by 4% year-over-year, while gold production dropped by 38%.
  • Copper head grade increased by 10%, but gold head grade fell by 40% due to mining through a lower-grade zone.
  • Gold recovery improved by 18% compared to Q2 2025.

Atico Mining's Q2 2026 results reflect a strategic focus on optimizing operational efficiency at the El Roble mine. The mixed performance in copper and gold production highlights the challenges of managing variable ore grades while investing in new equipment to improve access to higher-grade zones. This aligns with broader industry trends where mining companies balance short-term production fluctuations with long-term reserve development.

Production Optimization
Whether Atico can sustain improvements in copper grades and recovery rates as it optimizes new operational equipment.
Reserve Report
The impact of the anticipated updated reserve report on production targets for the second half of 2026.
Higher-Grade Ore Access
The pace at which Atico gains access to higher-grade ore zones and its effect on overall production volumes.