Arras Minerals Accelerates Drilling at Kazakhstan's Elemes Project

  • Arras Minerals recommenced diamond drilling at the Elemes Project in Kazakhstan on February 20, 2026, with two rigs operational and two more scheduled to arrive in March.
  • The 2026 program targets 30,000 meters of drilling, up from the initial 20,000 meters planned, reflecting growing confidence in the project's scale potential.
  • Drilling focuses on expanding the Berezski North and Berezski Central discoveries, with initial holes targeting high-grade gold-copper mineralization zones.
  • The project benefits from exceptional infrastructure, including a paved highway, power lines, and heavy rail access within a 15 km radius.

Arras Minerals' accelerated drilling at the Elemes Project underscores the growing confidence in the potential of the Bozshakol-Chingiz metallogenic belt. The project's proximity to significant regional deposits and its exceptional infrastructure position it favorably within Kazakhstan's copper-gold mining sector. The expansion of the drilling program to 30,000 meters reflects a strategic bet on the scale and continuity of the porphyry system, which could transform Arras into a key player in the region.

Resource Scale
Whether the expanded drilling program will confirm the scale and continuity of the porphyry system at Elemes, potentially positioning it as a significant copper-gold district.
Execution Risk
The pace at which Arras can advance and expand the Berezski North and Berezski Central discoveries while systematically testing new targets.
Market Positioning
How the results from Elemes will compare to nearby producing mines like KAZ Minerals' Bozshakol, influencing Arras' strategic positioning in the region.
Arras Minerals Fuels Kazakh Copper-Gold Hunt with Massive Drill Program