Acrow Completes Two Modular Steel Bridges for Rhode Island Bike Path

  • Acrow installed two 280-foot and 300-foot modular steel bridges in Rhode Island, replacing deteriorating 19th-century structures.
  • The bridges were completed and opened in October 2026, restoring full access to the 14.5-mile East Bay Bike Path.
  • The project featured rapid installation with minimal environmental impact, using a cantilever launch method to avoid cranes or barges.
  • Each bridge has a 14-foot walkway width and a silica sand deck designed for low maintenance and long-term durability.

Acrow’s completion of these bridges underscores the growing trend toward modular, sustainable infrastructure solutions. The project aligns with broader industry shifts toward rapid, low-impact construction methods, particularly in recreational and transportation sectors. The success of this project could position Acrow as a key player in the modular bridge market, especially as governments prioritize infrastructure resilience and environmental sustainability.

Project Scalability
Whether Acrow can replicate this rapid, low-impact installation model in other recreational trail projects.
Market Demand
The pace at which demand grows for modular steel bridges in infrastructure repair and expansion.
Environmental Compliance
How regulatory shifts may influence the adoption of low-impact construction methods in future projects.